College Avenue repaving begins Wednesday

Press release.

Traffic on College Avenue West, from Janefield Avenue to Edinburgh Road South, will be reduced to one lane in each direction starting Wednesday, July 2.

As part of its Annual Asphalt Program, the City will repave College Avenue West. The proposed work includes concrete curb repairs, replacement of asphalt paving, and a new roadway configuration.

“College Avenue is an arterial roadway as per the City’s
Official Plan
. It will be restriped as a three-lane arterial road, with a centre turn-lane, two lanes of traffic, and two bicycle lanes,” explains Jennifer Juste, transportation demand management coordinator, Engineering Services. “The addition of bicycle lanes is consistent ith the Bicycle Policy and the Cycling Master Plan, and will complete the bike route along College Avenue
.”

The repaving of College Avenue West is expected to take approximately four weeks to complete , weather permitting.

Two-way traffic will be maintained during construction, but delays can be expected. Every effort will be made to maintain access to driveways, but temporary delays for construction operations and equipment movement may occur between 7 a.m. and 7 p.m.

The City of Guelph appreciates residents’ patience, understanding and co-operation during this important construction work, and
will continue posting updates on guelph.ca/construction,
Twitter and Facebook

For more information about the Cycling Master Plan, please visit
guelph.ca/bike

Advertisements

Leave a comment

Filed under Traffic Management

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s